'Evera' Family of Pump Stations

EveraMOD™

Pre-Engineered Commercial Pump Stations—Delivered Fast, Installed Easy.

EveraMOD™ is INFRASTRUCTURE DYNAMICS’ turnkey, factory-direct pump station solution for commercial developments. It is designed to simplify procurement, shorten delivery timelines, and remain customizable without the cost or delay of an expensive, time-consuming custom build.

Engineering Support Design and documentation support for faster approvals.
Complete Package Factory-assembled, leak-tested, and certified equipment.
Fast Quoting Budgetary to final proposals—without the lag.
Easy Installation Drop-in ready equipment approach.

Perfect wastewater pumping solution for the following Applications:

  • Strip Malls, Business Parks, and Commercial sites
  • Residential Subdivisions & Private Developments
  • Budget-conscious projects needing dependable performance
Overview

EveraMOD™

A “product—not a project” approach with built-in design support is turnkey: standardized pump stations, expert guidance, and proven recommendations—so land development engineers can specify with confidence and reduce project risk.

Factory-direct Procurement

Streamline buying and reduce coordination complexity with a single integrated equipment package.

Delivery in Weeks

Pre-engineered configurations accelerate lead times—without giving up critical options.

Built for Long-term Reliability

Commercial-grade wastewater pumping performance with upgrade paths when your spec requires more.

Standard Sizes

Diameters: 48" • 60" • 66" • 72" Depths: up to 15 ft

Submersible pumps, control panel, and level controls included.

Made to Order

Choose a basic equipment package or upgrade to match your project requirements.

PE Services

Engineering calculations and construction document packages can be provided. Consult with Infrastructure Dynamics to coordinate scope and design responsibilities.

Fast Track Design Evaluation & Final Engineering

Let our engineering team assist with the Civil, Structural, Geotechnical, Hydraulic, and Electrical Engineering challenges that all must be considered when designing a wastewater pump station.

Basic Equipment Package

Package Includes

  • Structural Plastic Wetwell w/ Aluminum Access Hatch
  • Duplex Slide Rail package
  • SCH 80 PVC Discharge Piping with Internal Control Valves
  • Two (2) Wastewater Pumps (Grinders or Solids-handling type)
  • Four (4) Level Control Floats
  • NEMA 4X Control Panel w/ Alarm Light, Horn, & Silence Button
  • Factory Assembled, Leak Tested, and Certified
  • Includes Installation Guide + O&M Manuals

Product Specifications

  • Diameters: 48" • 60" • 66" • 72"
  • Depths: up to 15 ft (deeper wetwells available)
  • Pumps: Submersible Type (Grinder or Solids Handling)
  • Controls: Panel + Floats
  • Build: Made To Order

Everything you need for a complete commercial pump station package—factory assembled and job-site ready.

Available Upgrade Options

Controls & Monitoring

  • PLC & HMI Controller System & Remote Monitoring
  • Long Term Remote Monitoring & Trouble-Shoot Assistance
  • Analog Level Transducer

Vault Packages

  • External Valve Vault Package
  • Flow Meter Vault Package

Accessories & Power

  • Trash Basket with Rail System
  • Davit Crane
  • Factory Assembled Electrical Rack System
  • Emergency Generator w/ Automatic Transfer Switch

A next-generation engineering and manufacturing company delivering innovative equipment and infrastructure products for the water, wastewater, and energy storage utility markets.

© 2026 Infrastructure Dynamics. All rights reserved.