EveraFLOTM Case Study

Wallace Run – Pump Station

Big Beaver Borough, PA

Faced with a failing pump station and a tight federal funding deadline, Big Beaver Borough, PA, needed a fast, reliable solution after previous replacement efforts stalled. A complete EveraFLOTM pump station package was delivered—streamlining permitting, approvals, and installation. The result: on-time, cost-effective implementation that overcame delays common to traditional construction methods.

EveraFLO Municipal Series
Wallace Run EveraFLO wastewater pump station case study

Wallace Run pump station project (Big Beaver Borough, PA).

Owner

Big Beaver Borough

Location

Beaver County, Pennsylvania

Installation Date

October 2024

Scope of Supply

  • EveraFLO 93” Dia. Municipal Pump Station
  • Aluminum Access Hatch Cover
  • Duplex Pump Assembly
  • External Valve Vault Assembly
  • Electrical Panel Stand
  • Remote Control & Monitoring
  • Emergency Generator w/ ATS
  • Installation & Commissioning Support

Technical Data

EveraFLO 93”
Avg Daily Flow 90,000 GPD
Discharge Rate 250 GPM
Pump Type Duplex Submersible
(Grinder)
Wetwell Depth 25’

Packaged municipal station delivered as a coordinated replacement solution.

Need a budgetary configuration or basis-of-design?

Share flow targets and site constraints—our team will recommend an EveraFLO configuration aligned with permitting and constructability.