Case Study

Northview Escambia High School – EveraTREAT IFAS MEGA

Escambia, Florida

Owner
Escambia County School Board
Installation Date
April 2023
Northview Escambia EveraTREAT MEGA wastewater treatment case study Installed system overview (click to enlarge)
Overview

Restoring compliance with a fast, modular solution

To address failing water infrastructure at a rural public school, a turnkey water treatment and storage system was installed—restoring safe drinking water and sanitation with minimal disruption. Featuring modular filtration, off-grid reliability, and remote monitoring, the system brought the school back into compliance and improved hygiene and campus operations.

Rapid Deployment

Turnkey equipment package and commissioning support to minimize schedule risk and disruption.

Operational Visibility

Remote monitoring and control to support ongoing performance and faster response.

Expandable Platform

Modular equipment approach suited for public institutions facing urgent infrastructure needs.

Scope of Supply

Integrated infrastructure package

Delivered as a coordinated system, supported by installation and commissioning guidance.

Process + Treatment

  • EveraTANK™ flow equalization & headworks
  • EveraTREAT™ IFAS biological treatment system
  • Tertiary treatment & UV disinfection

Controls + Delivery

  • EveraBOX™ modular equipment building
  • Remote control & monitoring
  • Installation & commissioning support
System Visual

Packaged system configuration

Example layout/assembly image (click to enlarge).

Northview system configuration render

EveraTREAT™ IFAS system + ancillary infrastructure package.

Technical Data (Quick)

  • Project: Northview Escambia High School – WWTP
  • Location: Escambia, FL
  • Owner: Escambia County School Board
  • Installed: April 2023

Want a full basis-of-design package (drawings/specs) or operations support plan? Contact ID and we’ll tailor deliverables to your permitting and lifecycle requirements.

Technical Data

Constituent Influent Effluent (max)
Flow Rate 28,000 GPD (ADF)
BOD5 300 mg/L < 20 mg/L
TSS 300 mg/L < 5 mg/L
TKN 70 mg/L < 12 mg/L (NH3)
Phosphorous 10 mg/L < 4 mg/L
pH 6.5 to 8.5 6.5 to 8.5
Fats, Oils, Grease < 10 mg/L NA
Water Temperature 40°F to 95°F < 105°F

INSTALLATION DATE: April 2023

Need preliminary design support or a compliant submittal package?

Share your flow assumptions and site conditions—ID will recommend the right configuration and documentation path.