EveraFLOTM Case Study

Bridgewater Grande – Pump Station

Franklin County, VA

Bridgewater Grande is a new residential development on Smith Mountain Lake in Franklin County, Virginia, requiring reliable wastewater infrastructure to support long-term community growth. Our turnkey, factory-built pump station solution provided efficient wastewater conveyance while minimizing on-site construction and environmental impact.

Designed to meet local requirements and the unique conditions of a lakeside development, the system delivers dependable performance, simplified maintenance, and long-term durability. The completed project reflects a cost-effective, low-disruption approach to new residential infrastructure.

EveraFLO Municipal Series
Bridgewater Grande EveraFLO pump station project

Bridgewater Grande Pump Station (Franklin County, VA).

Owner

Western Virginia Water Authority

Location

Franklin County, Virginia

Installation Date

December 2025

Scope of Supply

  • EveraFLO 66” Dia. Municipal Pump Station
  • Aluminum Access Hatch Cover
  • Duplex Pump Assembly
  • External Valve Vault Assembly
  • Modular Equipment Building
  • Remote Control & Monitoring
  • Emergency Generator w/ ATS
  • Installation & Commissioning Support

Technical Data

EveraFLO 66”
Avg Daily Flow 20,250 GPD
Discharge Rate 85 GPM
Pump Type Duplex Submersible
(Grinder)
Wetwell Depth 14.5’

Packaged municipal station delivered as new installation.

Need a budgetary configuration or basis-of-design?

Share flow targets and site constraints—our team will recommend an EveraFLO configuration aligned with permitting and constructability.

A next-generation engineering and manufacturing company delivering innovative equipment and infrastructure products for the water, wastewater, and energy storage utility markets.

© 2026 Infrastructure Dynamics. All rights reserved.