Franklin County, VA
Bridgewater Grande is a new residential development on Smith Mountain Lake in Franklin County, Virginia, requiring reliable wastewater infrastructure to support long-term community growth. Our turnkey, factory-built pump station solution provided efficient wastewater conveyance while minimizing on-site construction and environmental impact.
Designed to meet local requirements and the unique conditions of a lakeside development, the system delivers dependable performance, simplified maintenance, and long-term durability. The completed project reflects a cost-effective, low-disruption approach to new residential infrastructure.
Western Virginia Water Authority
Franklin County, Virginia
December 2025
| EveraFLO 66” | |
|---|---|
| Avg Daily Flow | 20,250 GPD |
| Discharge Rate | 85 GPM |
| Pump Type | Duplex Submersible (Grinder) |
| Wetwell Depth | 14.5’ |
Packaged municipal station delivered as new installation.
Share flow targets and site constraints—our team will recommend an EveraFLO configuration aligned with permitting and constructability.
A next-generation engineering and manufacturing company delivering innovative equipment and infrastructure products for the water, wastewater, and energy storage utility markets.