Escambia, Florida
Installed system overview (click to enlarge)
To address failing water infrastructure at a rural public school, a turnkey water treatment and storage system was installed—restoring safe drinking water and sanitation with minimal disruption. Featuring modular filtration, off-grid reliability, and remote monitoring, the system brought the school back into compliance and improved hygiene and campus operations.
Turnkey equipment package and commissioning support to minimize schedule risk and disruption.
Remote monitoring and control to support ongoing performance and faster response.
Modular equipment approach suited for public institutions facing urgent infrastructure needs.
Delivered as a coordinated system, supported by installation and commissioning guidance.
Example layout/assembly image (click to enlarge).
Want a full basis-of-design package (drawings/specs) or operations support plan? Contact ID and we’ll tailor deliverables to your permitting and lifecycle requirements.
| Constituent | Influent | Effluent (max) |
|---|---|---|
| Flow Rate | 28,000 GPD (ADF) | — |
| BOD5 | 300 mg/L | < 20 mg/L |
| TSS | 300 mg/L | < 5 mg/L |
| TKN | 70 mg/L | < 12 mg/L (NH3) |
| Phosphorous | 10 mg/L | < 4 mg/L |
| pH | 6.5 to 8.5 | 6.5 to 8.5 |
| Fats, Oils, Grease | < 10 mg/L | NA |
| Water Temperature | 40°F to 95°F | < 105°F |
INSTALLATION DATE: April 2023
Share your flow assumptions and site conditions—ID will recommend the right configuration and documentation path.
A next-generation engineering and manufacturing company delivering innovative equipment and infrastructure products for the water, wastewater, and energy storage utility markets.